45-Day Public Comment Period
Public Comment Period: August 13, 2021-September 27, 2021 |
ACCESS and GREEN Code Advisory Committees |
Notice of 45-Day Public Comment Period: August 13, 2021-September 27, 2021
The following state agencies have submitted proposed actions (code changes) that are intended for inclusion in the 2022 California Building Standards Code, Title 24, scheduled for publication in July 2022 with an effective date of January 2023. All proposed actions are subject to a 45-day public comment period. All public comments will be accepted until midnight on September 27, 2021.
State Agencies
California Building Standards Commission
BSC 03/21—Amend the 2022 edition of the California Green Building Standards Code, Part 11, Title 24
- Notice of Proposed Action—BSC 03/21
- Initial Statement of Reasons—BSC 03/21
- Initial Express Terms—BSC 03/21
- Commission Action Matrix—BSC 03/21
Posted Public Comments:
* non-viewable via CBSC's website
- M. Roest - BSC 03/21 - Part 11 EV infrastructure
- StopWaste - BSC 03/21 - Part 11 Item 03-21-1-1 EV
- L. Renger - BSC 03/21 - Part 11 Item 03-21-8-1 EV
- L. Renger - BSC 03/21 - Part 11 Item 03-21-8-2 EV
- CALBO - BSC 03/21 - Part 11 Section 5.106.5.3.4
- V. Warheit - BSC 03/21 - Part 11 EV infrastructure
- V. Warheit - BSC 03/21 - Part 11 Item 03-21 EV infrastructure
- V. Warheit - BSC 03/21 - Part 11 Item 03-21-1-1 EV infrastructure
- V. Warheit - BSC 03/21 - Part 11 Item 7 EV infrastructure
- D. MacCurdy - BSC 03/21 - Part 11 EV infrastructure
- G. Hall - BSC 03/21 - Part 11 Item 7
- D. MacCurdy - BSC 03/21 - Part 11 EV infrastructure
- D. MacCurdy - BSC 03/21 - Part 11 EV infrastructure - attachment
- PowerFlex - BSC 03/21 - Part 11 EV infrastructure
- PowerFlex - BSC 03/21 - Part 11 EV infrastructure - attachment
- N. Derrickson - EV Industry Coalition - BSC 03/21 - Part 11 EV infrastructure
- J. Frey & P. Mustacich - BSC 03/21 - Part 11 EV infrastructure
- P. Kobernick - BSC 03/21 - Part 11 EV infrastructure
- Union of Concerned Scientists (spreadsheet of 2046 separate comments) - BSC 03/21 - Part 11 EV infrastructure
- Plug In America (spreadsheet of 327 separate comments) - BSC 03/21 - Part 11 EV infrastructure
Division of the State Architect—Access Compliance
DSA-AC 01/21—Adopt and amend Chapter 11B of the 2022 edition of the California Building Code, Part 2, Title 24
- Notice of Proposed Action—DSA-AC 01/21
- Initial Statement of Reasons—DSA-AC 01/21
- Initial Express Terms—DSA-AC 01/21
- Attachment A—DSA-AC 01/21
- Commission Action Matrix—DSA-AC 01/21
Posted Public Comments:
* non-viewable via CBSC's website
- S. Johnson - DSA-AC 01/21 - Section 202
- J. Kent - DSA-AC 01/21 - Section 207.1
- E. McSwain - DSA-AC 01/21 - Part 2 Section 11B-206.4
- E. McSwain - DSA-AC 01/21 - Part 2 Section 11B-207
- N. Scott - DSA-AC 01/21 - Part 2 Chapter 11B_01-3
- N. Scott - DSA-AC 01/21 - Part 2 Chapter 11B_02-1
- N. Scott - DSA-AC 01/21 - Part 2 Chapter 11B_01-1
- N. Scott - DSA-AC 01/21 - Part 2 Chapter 11B_01-2
- N. Scott - DSA-AC 01/21 - Part 2 Chapter 11B_01-4
- CALBO - DSA-AC 01/21 - Part 2 Chapter 11B Item 2
Division of State Architect—Structural Safety
DSA-SS/CC 03/21—Amend the 2022 edition of the California Green Building Standards Code, Part 11, Title 24
- Notice of Proposed Action—DSA-SS/CC 03/21
- Initial Statement of Reasons—DSA-SS/CC 03/21
- Initial Express Terms—DSA-SS/CC 03/21
- Commission Action Matrix—DSA-SS/CC 03/21
Posted Public Comments:
* non-viewable via CBSC's website
- M. Roest - DSA-SS 03/21 - Part 11 EV infrastructure
- D. DeAngelis - DSA-SS 03/21 - Part 11 Item 03-21-10-1 CO2
- StopWaste - DSA-SS 03/21 - Part 11 Item 03-21-1-1 EV
- L. Renger - DSA-SS 03/21 - Part 11 Item 03-21-8-1 EV
- L. Renger - DSA-SS 03/21 - Part 11 Item 03-21-8-2 EV
- CALBO - DSA-SS 03/21 - Part 11 Section 5.106.5.3.4
- V. Warheit - DSA-SS 03/21 - Part 11 EV infrastructure
- V. Warheit - DSA-SS 03/21 - Part 11 Item 03-21 EV infrastructure
- V. Warheit - DSA-SS 03/21 - Part 11 Item 03-21-1-1 EV infrastructure
- V. Warheit - DSA-SS 03/21 - Part 11 Item 7 EV infrastructure
- D. MacCurdy - DSA-SS 03/21 - Part 11 EV infrastructure
- G. Hall - DSA-SS 03/21 - Part 11 Item 7
- D. MacCurdy - DSA-SS 03/21 - Part 11 EV infrastructure
- D. MacCurdy - DSA-SS 03/21 - Part 11 EV infrastructure - attachment
- PowerFlex - DSA-SS 03/21 - Part 11 EV infrastructure
- PowerFlex - DSA-SS 03/21 - Part 11 EV infrastructure - attachment
- N. Derrickson - EV Industry Coalition - DSA-SS 03/21 - Part 11 EV infrastructure
- J. Frey & P. Mustacich - DSA-SS 03/21 - Part 11 EV infrastructure
- P. Kobernick - DSA-SS 03/21 - Part 11 EV infrastructure
Department of Housing and Community Development
HCD 03/21—Amend the 2022 edition of the California Green Building Standards Code, Part 11, Title 24
- Notice of Proposed Action—HCD 03/21
- Initial Statement of Reasons—HCD 03/21
- Initial Express Terms—HCD 03/21
- Commission Action Matrix—HCD 03/21
Posted Public Comments:
* non-viewable via CBSC's website
- M. Roest - HCD 03/21 - Part 11 EV infrastructure
- Form Letter Comment - HCD 03/21 - Part 11 - MFH EV Charging
- Submitted by the following:
- A. Fierro-Clarke
- A. Stuart
- A. Syed
- B. Ballinger
- C. Trumello
- D. Gangsei
- D. Nelson
- D. Sparacin
- J. Baxter
- J. Brooks
- J. Cecil
- J. Knox
- J. Truong
- J. Vandergriff
- J. Willert
- K. Boyd
- L. Mott
- L. Nichols
- P. Lydon
- P. Mackin
- P. Vachal
- R. Goodman
- S. Jacobi
- S. Jeffress
- S. Kress
- S. Meinzen
- S. Narducy
- S. Ryan
- T. Martin
- T. Nocera
- T. Snyder
- T. Strand
- W. Foster
- Z. Dietrich
- A. Dorsey - HCD 03/21 - Part 11 - Item 03-21-1-1 EV infrastructure
- A. Erickson - HCD 03/21 - Part 11 - Item 03-21-1-1 EV infrastructure
- A. Kramer - HCD 03/21 - Part 11 - Item 03-21-1-1 EV infrastructure
- A. Tate - HCD 03/21 - Part 11 - Item 03-21-1-1 EV infrastructure
- B. Montgomery - HCD 03/21 - Part 11 - Item 03-21-1-1 EV infrastructure
- C. Broome - HCD 03/21 - Part 11 - Item 03-21-1-1 EV infrastructure
- C. Chapman - HCD 03/21 - Part 11 - Item 03-21-1-1 EV infrastructure
- C. Davidson - HCD 03/21 - Part 11 - Item 03-21-1-1 EV infrastructure
- C. Graves - HCD 03/21 - Part 11 - Item 03-21-1-1 EV infrastructure
- C. Hoex - HCD 03/21 - Part 11 - Item 03-21-1-1 EV infrastructure
- C. Levey - HCD 03/21 - Part 11 - Item 03-21-1-1 EV infrastructure
- D. Denton - HCD 03/21 - Part 11 - Item 03-21-1-1 EV infrastructure
- D. Kato - HCD 03/21 - Part 11 - Item 03-21-1-1 EV infrastructure
- D. Wilde - HCD 03/21 - Part 11 - Item 03-21-1-1 EV infrastructure
- E. Dooley - HCD 03/21 - Part 11 - Item 03-21-1-1 EV infrastructure
- E. Dunlap - HCD 03/21 - Part 11 - Item 03-21-1-1 EV infrastructure
- E. Salinger - HCD 03/21 - Part 11 - Item 03-21-1-1 EV infrastructure (submitted more than once)
- G. Shanker - HCD 03/21 - Part 11 - Item 03-21-1-1 EV infrastructure *
- H. Meyers - HCD 03/21 - Part 11 - Item 03-21-1-1 EV infrastructure
- J. Burris - HCD 03/21 - Part 11 - Item 03-21-1-1 EV infrastructure
- J. Carpenter - HCD 03/21 - Part 11 - Item 03-21-1-1 EV infrastructure
- J. Craven - HCD 03/21 - Part 11 - Item 03-21-1-1 EV infrastructure
- J. Kalb - HCD 03/21 - Part 11 - Item 03-21-1-1 EV infrastructure
- J. Keller - HCD 03/21 - Part 11 - Item 03-21-1-1 EV infrastructure
- J. Perlman - HCD 03/21 - Part 11 - Item 03-21-1-1 EV infrastructure
- K. Davis - HCD 03/21 - Part 11 - Item 03-21-1-1 EV infrastructure
- K. Kirschling - HCD 03/21 - Part 11 - Item 03-21-1-1 EV infrastructure
- L. Barbour - HCD 03/21 - Part 11 - Item 03-21-1-1 EV infrastructure
- L. Downey - HCD 03/21 - Part 11 - Item 03-21-1-1 EV infrastructure
- L. Giri - HCD 03/21 - Part 11 - Item 03-21-1-1 EV infrastructure
- L. Pressman - HCD 03/21 - Part 11 - Item 03-21-1-1 EV infrastructure
- L. Sanchez - HCD 03/21 - Part 11 - Item 03-21-1-1 EV infrastructure
- M. Khalsa - HCD 03/21 - Part 11 - Item 03-21-1-1 EV infrastructure
- N. Gatschet - HCD 03/21 - Part 11 - Item 03-21-1-1 EV infrastructure
- N. Ruiz - HCD 03/21 - Part 11 - Item 03-21-1-1 EV infrastructure
- P. Kinney - HCD 03/21 - Part 11 - Item 03-21-1-1 EV infrastructure
- P. Lowery - HCD 03/21 - Part 11 - Item 03-21-1-1 EV infrastructure
- R. Dodge - HCD 03/21 - Part 11 - Item 03-21-1-1 EV infrastructure
- S. Cramer - HCD 03/21 - Part 11 - Item 03-21-1-1 EV infrastructure
- S. Thesen - HCD 03/21 - Part 11 - Item 03-21-1-1 EV infrastructure
- W. Chou - HCD 03/21 - Part 11 - Item 03-21-1-1 EV infrastructure
- R. Whitehair - HCD 03/21 - Part 11 - Item 03-21-1-1 EV infrastructure
- StopWaste - HCD 03/21 - Part 11 Item 03-21-1-1 EV
- A. Mossman - HCD 03/21 - Part 11 Item 03-21-1-1 EV infrastructure
- B. Hilton - HCD 03/21 - Part 11 Item 03-21-1-1 EV infrastructure (submitted more than once)
- B. Korfmacher - HCD 03/21 - Part 11 Item 03-21-1-1 EV infrastructure
- C. Hendry - HCD 03/21 - Part 11 Item 03-21-1-1 EV infrastructure
- C. Lish - HCD 03/21 - Part 11 Item 03-21-1-1 EV infrastructure
- D. Bezanson - HCD 03/21 - Part 11 Item 03-21-1-1 EV infrastructure
- D. Hernas - HCD 03/21 - Part 11 Item 03-21-1-1 EV infrastructure
- D. Link - HCD 03/21 - Part 11 Item 03-21-1-1 EV infrastructure
- A. Harvey - HCD 03/21 - Part 11 Item 03-21-1-1 EV infrastructure
- B. Formigli - HCD 03/21 - Part 11 Item 03-21-1-1 EV infrastructure
- DSA I. Clair - HCD 03/21 - Part 11 Item 4 Section 4.106.4
- DSA I. Clair - HCD 03/21 - Part 11 Item 11 Section A4.106.8.2.1
- E. Cohen - HCD 03/21 - Part 11 Item 03-21-1-1 EV infrastructure
- G. Dukes - HCD 03/21 - Part 11 Item 03-21-1-1 EV infrastructure
- J. Adler - HCD 03/21 - Part 11 Item 03-21-1-1 EV infrastructure
- J. Holme - HCD 03/21 - Part 11 Item 03-21-1-1 EV infrastructure
- J. I. Weisman - HCD 03/21 - Part 11 Item 03-21-1-1 EV infrastructure
- J. Lahaie - HCD 03/21 - Part 11 Item 03-21-1-1 EV infrastructure
- J. Reister - GOPOWER - HCD 03/21 - Part 11 Item 03-21-1-1 EV infrastructure
- J. Riley - HCD 03/21 - Part 11 Item 03-21-1-1 EV infrastructure
- K. Bumpass - HCD 03/21 - Part 11 Item 03-21-1-1 EV infrastructure
- K. Gibson - HCD 03/21 - Part 11 Item 03-21-1-1 EV infrastructure
- K. Ma - HCD 03/21 - Part 11 Item 03-21-1-1 EV infrastructure
- L. Emerson - HCD 03/21 - Part 11 Item 03-21-1-1 EV infrastructure
- L. Fraser - HCD 03/21 - Part 11 Item 03-21-1-1 EV infrastructure
- L. LaCount - HCD 03/21 - Part 11 Item 03-21-1-1 EV infrastructure
- L. Simpson - HCD 03/21 - Part 11 Item 03-21-1-1 EV infrastructure
- M. Bergson - HCD 03/21 - Part 11 Item 03-21-1-1 EV infrastructure
- M. Burns - HCD 03/21 - Part 11 Item 03-21-1-1 EV infrastructure
- M. Pierce - HCD 03/21 - Part 11 Item 03-21-1-1 EV infrastructure
- M. Sedio - HCD 03/21 - Part 11 Item 03-21-1-1 EV infrastructure
- N. Schleifer - HCD 03/21 - Part 11 Item 03-21-1-1 EV infrastructure
- R. Besso - HCD 03/21 - Part 11 Item 03-21-1-1 EV infrastructure
- R. Buengener - HCD 03/21 - Part 11 Item 03-21-1-1 EV infrastructure
- S. Birdledough - HCD 03/21 - Part 11 Item 03-21-1-1 EV infrastructure
- S. Dunlap - HCD 03/21 - Part 11 Item 03-21-1-1 EV infrastructure
- S. Lee - HCD 03/21 - Part 11 Item 03-21-1-1 EV infrastructure
- S. Morris - HCD 03/21 - Part 11 Item 03-21-1-1 EV infrastructure
- T. Edwards - HCD 03/21 - Part 11 Item 03-21-1-1 EV infrastructure
- V. Dunch - HCD 03/21 - Part 11 Item 03-21-1-1 EV infrastructure
- W. Hastings - HCD 03/21 - Part 11 Item 03-21-1-1 EV infrastructure
- B. Coolidge - HCD 03/21 - Part 11 Item 03-21-1-1 EV infrastructure
- B. Van Der Raay - HCD 03/21 - Part 11 Item 03-21-1-1 EV infrastructure
- Jim M. - HCD 03/21 - Part 11 Item 03-21-1-1 EV infrastructure
- CALBO - HCD 03/21 - Part 11 Item 4
- C. Sandoval - HCD 03/21 - Part 11 Item 03-21-1-1 EV infrastructure
- C. Starner - HCD 03/21 - Part 11 Item 03-21-1-1 EV infrastructure
- L. H. Knowles - HCD 03/21 - Part 11 Item 03-21-1-1 EV infrastructure
- W. Kwok - HCD 03/21 - Part 11 Item 03-21-1-1 EV infrastructure
- V. Warheit - HCD 03/21 - Part 11 EV infrastructure
- B. Haberly - HCD 03/21 - Part 11 Item 03-21-1-1 EV infrastructure
- B. Naegel - HCD 03/21 - Part 11 Item 03-21-1-1 EV infrastructure
- B. Thagard - HCD 03/21 - Part 11 Item 03-21-1-1 EV infrastructure
- ChargePoint - HCD 03/21 - Part 11 EV infrastructure
- ChargePoint - HCD 03/21 - annotated Express Terms*
- Coalition of MCE/PCE/RCEA/CPA/EBCE (email) - HCD 03/21 - Part 11 EV infrastructure
- Coalition of MCE/PCE/RCEA/CPA/EBCE (attachment) - HCD 03/21 - Part 11 EV infrastructure
- D. MacGurdy - HCD 03/21 - Part 11 Item 4.2 EV infrastructure
- G. Latshaw - HCD 03/21 - Part 11 Item 03-21-1-1EV infrastructure
- H. Macleod - HCD 03/21 - Part 11 Item 03-21-1-1 EV infrastructure
- I. Chaudhuri - HCD 03/21 - Part 11 Item 03-21-1-1 EV infrastructure
- I. Tregub - HCD 03/21 - Part 11 Item 03-21-1-1 EV infrastructure
- J. Levin - HCD 03/21 - Part 11 Item 03-21-1-1 EV infrastructure
- J. Yahn - HCD 03/21 - Part 11 Item 03-21-1-1 EV infrastructure
- K. Trisolini - HCD 03/21 - Part 11 Item 03-21-1-1 EV infrastructure
- L. Weston - HCD 03/21 - Part 11 Item 03-21-1-1 EV infrastructure
- M. Chen - HCD 03/21 - Part 11 Item 03-21-1-1 EV infrastructure
- M. M. Roussere - HCD 03/21 - Part 11 Item 03-21-1-1 EV infrastructure
- M. Wittig - HCD 03/21 - Part 11 Item 03-21-1-1 EV infrastructure
- N. Dunlap - HCD 03/21 - Part 11 Item 03-21-1-1 EV infrastructure
- P. Buel - HCD 03/21 - Part 11 Item 03-21-1-1 EV infrastructure
- P. Costello - HCD 03/21 - Part 11 Item 03-21-1-1 EV infrastructure
- P. Morton - HCD 03/21 - Part 11 Item 03-21-1-1 EV infrastructure
- S. Salin - HCD 03/21 - Part 11 Item 03-21-1-1 EV infrastructure
- S. Thesen - HCD 03/21 - Part 11 Item 03-21-1-1 EV infrastructure
- T. Moon - HCD 03/21 - Part 11 Item 03-21-1-1 EV infrastructure
- G. Hall - HCD 03/21 - Part 11 Item 4.1 EV infrastructure
- G. Hall - HCD 03/21 - Part 11 Item 4.2 EV infrastructure
- V. Warheit - HCD 03/21 - Part 11 Chapter 4 Item 03-21-1-1
- V. Warheit - HCD 03/21 - Part 11 Chapter 4 Item 4
- S. Thesen - HCD 03/21 - Part 11 Item 4
- S. Thesen - HCD 03/21 - Part 11 Item 4 attachment*
- D. MacCurdy - HCD 03/21 - Part 11 EV infrastructure
- D. MacCurdy - HCD 03/21 - Part 11 EV infrastructure - attachment
- PowerFlex - HCD 03/21 - Part 11 EV infrastructure
- PowerFlex - HCD 03/21 - Part 11 EV infrastructure - attachment
- N. Derrickson - EV Industry Coalition - HCD 03/21 - Part 11 EV infrastructure
- J. Frey & P. Mustacich - HCD 03/21 - Part 11 EV infrastructure
- P. Kobernick - HCD 03/21 - Part 11 EV infrastructure
- RMI - B. K. Gross - HCD 03/21 - Part 11 EV infrastructure
- S. Krishnan - HCD 03/21 - Part 11 EV infrastructure
- Also submitted by the following:
- M. Silverman
- D. Key
- J. Teevan
- P. Grantham
- T. Stawney
- G. M. Roque'
- L. Okrainsky
- P. Reaves
- A. Breithaupt
- P. R. Cate
- R. Womack
- S. Marwood
- C. Scolari
- S. Perry
- V. Kugel
- L. Williams
- C. Pesko
- D. Fiedler
- J. Berwick
- J. Altounji
- S. Ryals
- S. Gove
- E. Gonzalez
- T. Robinson
- E. Paetow
- H. O'Connor
- V. P. Martinez
- G. Christensen
- B. Holzinger
- K. Govil
- M. Spadone
- T. Johnson
- J. Cook
- W. Wong
- J. Pointon
- S. Lunceford
- D. Prakken
- S. Shmidt
- S. Schneider
- L. Applebaum
- C. Hamilton
- J. Caplan
- J. Bradley
- C. Lista
- D. Z
- C. Joyner
- S. Patel
- D. Roddick
- D. Simmons
- F. C. Reuscher
- L. Ryan
- S. Greene
- J. Schultz
- A. Shen
- B. Guerdat
- N. Adeyi
- G. Frleta
- P. Deras
- M. Willson
- D. Harkness
- M. Mills
- F. King
- E. Taylor
- J. Rowley
- S. Katz
- R. Bell
- C. Hong
- B. Zuckerman
- R. Abad
- M. F. Kelly-Poh
- J. Block
- M. Galanty
- R. Corcoran
- S. Price
- S. Scheiberg
- M. Duprey
- R. Harlan
- D. Isler
- J. Ruiz
- M. D'Adamo
- K. Thigpen
- B. Greenwalt
- P. Petrie
- R. Kutz
- D. L. Hughes
- G. Letsos
- A. Ramirez
- A. Tang
- R. Kau
- C. Wright
- X. Hermosillo
- R. Schreiber
- K. Kerridge
- F. King
- P. Lang
- J. Leong
- J. Martinez
- M. Voge
- R. Rosenbloom
- M. Estrella
- M. R. LeBaron
- J. R. P.
- J. Higbie
- C. Parks
- L. Cohen
- T. Hall
- M. Keller
- E. Kalman
- R. Saher
- Electrified
- S. Meinzen
- J. A. S. Fiske
- J. Christensen
- J. Neff
- M. Vis
- J. Parks
- O. Chang
- V. VanKuran
- M. Simjee
- D. Edel
- A. Torre - HCD 03/21 - Part 11 EV infrastructure
- B. Quigley - HCD 03/21 - Part 11 EV infrastructure
- C. Ih - HCD 03/21 - Part 11 EV infrastructure
- J. Jenkins - HCD 03/21 - Part 11 EV infrastructure
- K. Hartmen - HCD 03/21 - Part 11 EV infrastructure
- L. Meisenheimer - HCD 03/21 - Part 11 EV infrastructure
- M. Weimer - HCD 03/21 - Part 11 EV infrastructure
- O. Strogats - HCD 03/21 - Part 11 EV infrastructure
- P. Montgomery - HCD 03/21 - Part 11 EV infrastructure
- R. Carrico - HCD 03/21 - Part 11 EV infrastructure
- S. Cunnie - HCD 03/21 - Part 11 EV infrastructure
- S. Freedman - HCD 03/21 - Part 11 EV infrastructure
- S. Tobin - HCD 03/21 - Part 11 EV infrastructure
- Union of Concerned Scientists (spreadsheet of 2046 separate comments) - HCD 03/21 - Part 11 EV infrastructure
- Plug In America (spreadsheet of 327 separate comments) - HCD 03/21 - Part 11 EV infrastructure
HCD 1-AC 04/21—Adopt and amend Chapter 11A of the 2022 edition of the California Building Code, Part 2, Title 24
- Notice of Proposed Action—HCD 1-AC 04/21
- Initial Statement of Reasons—HCD 1-AC 04/21
- Initial Express Terms—HCD 1-AC 04/21
- Commission Action Matrix—HCD 1-AC 04/21
Posted Public Comments:
* non-viewable via CBSC's website
Rulemaking Activities
- Code Adoption Cycles
- Change Without Regulatory Effect
- Emergency Rulemaking
2021 Code Adoption Cycle
State agency acronyms
- BSC—California Building Standards Commission
- CEC—California Energy Commission
- DSA-AC—Division of the State Architect—Access Compliance
- DSA-SS/CC—Division of the State Architect—Structural Safety/Community Colleges
- DWR—Department of Water Resources
- HCD—Department of Housing & Community Development
- OSHPD—Office of Statewide Hospital Planning and Development
- SFM—Office of the State Fire Marshal
Request for Public Comments
For a copy of a public comment that is not linked, email CBSC. Include in your request:
- 45-day comment period
- State agency rulemaking number
- Name of the commenter