PROJECT APPROVAL LIFECYCLE BASIC POLICY - 4921
(Revised: 11/2016)
Project Approval Lifecycle (PAL) Stage/Gate deliverables must be reviewed and approved in accordance with the general requirements of SAM Sections 4819.3- 4819.42 (State Information Management Authority and Responsibility), as well as the specific requirements of Sections 4927-4928. See SIMM Section 19 for PAL Stage/Gate deliverable Preparation Instructions.
Revisions
No Revisions for this item.
Search Entire Manual
Print Entire SAM Manual
Please bear with us, generating the entire SAM for printing will take approximately two minutes.